Contact Us

We're committed to keeping you informed throughout the planning study. If you would like more information about the project, please use one of the following resources:

Seattle Department of Transportation 

Address: 700 5th Ave, Suite 3800, Seattle, WA, 98104

Phone: (206) 684-7623

© 2023 by ITG. Proudly created with Wix.com

6. Mid Level Moveable Bridge (replacement)

Key Components:

  • Replacement bridge with 21-ft increase in clearance compared to existing

  • Reduction of structure openings by about 50% (varies by season and time of day)

  • 14-ft wide shared use path added to the West side of the existing structure

  • Wider lane channelization: two outside 12-ft lanes and two inside 11-ft lanes

  • Single Point Urban Interchange (SPUI) to replace the existing 15th Ave W & Emerson/Nickerson interchange

Note: Image not to scale

  • Black RSS Icon